Terry Fox Sidewalk Replacement Project Update 

As I had shared in June, the existing sidewalks on Terry Fox Drive, from March Road to March Valley Drive, will be replaced with concrete sidewalks this fall. 

Construction is anticipated to start in September and notices have been mailed to all affected residents.  

What can residents expect during construction? 

Residents can expect construction traffic and activity along Terry Fox Drive. The road will remain open to traffic. Accesses from Terry Fox Drive to the adjacent commercial and industrial properties at 600 and 700 March Road and 340, 349 and 359 Terry Fox Drive may be individually closed during construction; however, an alternate access will remain open. 

Pedestrian and cyclist access will be maintained along Terry Fox Drive at all times during construction. 

Please don’t hesitate to reach out should you have any questions or concerns.