Weslock Park Lifecycle Replacement Project

February 17, 2023

diagram-arrow-down

The City of Ottawa is seeking input on concept plans prepared for the lifecycle replacement of the junior playground equipment in Weslock Park.

According to the Strategic Asset Management Plan (2017), the Ageing Assets Strategy states that “to maintain levels of service over time and to remain sustainable, not all assets should or can be replaced before reaching the end of their expected service life.”

Therefore, the scope of the current lifecycle replacement project is specific to; a pathway extension from the north park entrance to the play structure, a new park sign, and replacement of the junior play structure and swings. Engineered wood fiber is proposed as the protective surfacing material for the playground to meet accessibility requirements.

To look at the two different concept plans, as well as send in comments, please go to the project’s Engage Ottawa page at Weslock Park | Engage Ottawa.